Good morning! It’s Sept. 14 — here’s what’s going on in your community today…
Mostly sunny and warmer in the San Lorenzo Valley
Today will be mostly sunny and warmer. The high will be 85 with a low of 53. Wear your sunblock — the UV index is high (6/11). Allergy sufferers beware: There are high amounts of ragweed in the air.
Top news from nearby
The Capitola City Council approved a polyester concrete overlay for the nearly 100-year-old Stockton Avenue Bridge to extend its lifespan, with plans for long-term repairs or replacement and expected short-term construction impacts.
What’s new around you
▼︎ road incidents ▼︎ real estate ▼︎ events

Read on to see the details about each item…
Things to do in San Lorenzo Valley

Roaring Camp Railroads: Redwood Forest Steam Train
Travel over trestles, through towering redwood groves and up a winding narrow-gauge grade to the summit of Bear Mountain as conductors narrate the history …
At Roaring Camp Railroads on Sept. 14

Pastel Painting Class
Soft Pastel Painting runs in six week intervals taught by instructor Sarah Orre. A short demo will be taught the first class meeting with reference …
At Community Through Art on Sept. 15
Repeats 4 more times until Oct. 13

Felton Farmers Market
The Felton Farmers Market is a treasured weekly gathering May through October, now running for over 30 years. We appreciate the dedicated customers …
At Felton Farmers Market on Sept. 15

Adult Ceramics Class
Beginning adult ceramics with instructor Nora Sarkissian. Learn the basics of hand building, pinch, and coil. Nora will provide demos and projects as …
At Community Through Art on Sept. 15
Repeats 13 more times until Dec. 15
Roadwork is affecting traffic in the region
- There are alternating lane closures on both northbound and southbound Highway 9 at Pool Drive because of bridge work. This will continue until April 30, 2027.
- Highway 9 at Ramona Drive has one-way traffic today because of drainage work.
Property development
- The Santa Cruz County Planning Department has received a zoning application for a proposed project at 15015 Two Bar Rd. The project calls for the construction of retaining walls ranging from 3 to 9 feet in height to support new driveway access, along with grading and installation of drainage improvements. Plans include building an over-height fence, which requires a Site Development Permit, and conducting earthwork involving approximately 60 cubic yards of cut and 48 cubic yards of fill. Stormwater management features such as catch basins, concrete swales, and rock-lined drainage channels will be installed, along with erosion control measures. The retaining walls will use steel soldier piles with wood or concrete lagging and will incorporate subdrain systems to manage water. The project is designed to comply with all relevant building, fire, and environmental codes, and will implement best management practices for stormwater, erosion, and construction site management. (view application)
No crimes to report today
We checked with local police and there were no new incidents to report.
Disclosure: Traffic incidents and property development updates are partially generated by artificial intelligence. We are constantly working to improve the accuracy and quality of our AI-generated content. However, there may still be errors or inaccuracies. If you have any questions or concerns, please contact us.


